Car Auto Parts Steering Parts Tie Rod End for Isuzu 8-94103-222-2

Short Description:

OE NO.: 8-94103-222-2
DESCRIPTION: Tie Rod End
Car Fitment:  Isuzu  -


Product Detail

Product Tags

Type: OEM Standard Size Material: NR-metal
Size: OEM Standard Size Warranty: 24 Months
Color: Black MOQ: 100
Delivery time: 15~35 Days Shipping term: SEA or AIR
Payment: T/T Packing: Neutral Packing/Custmized Packing

Function:The tie rod end is part of the vehicle steering mechanism. It is one of the main pivots in the steering system to turn the wheels. Depending on the type of system, the mechanical box system can have either an inner tie rod or an outer tie rod, or only the outer tie rod end in the more popular rack and pinion system. In the rack and pinion transmission system, the tie rod end is the joint connecting the axial joint and the wheel, which transfers the force from the rack and pinion to the steering knuckle.

Competitive Advantages:

Guarantee/Warranty
Packaging
Product Performance
Prompt Delivery
Quality Approvals
Service
Small Orders Accepted

Warranty:

Our warranty covers products shipped from us for duration of 24 Months.
We will offer you a free replacement for the defective products in your future orders.
This warranty does not cover failures due to:

• Accident or collision.
• Improper installation.
• Misuse or abuse.
• Consequential damages due to failure of other parts.
• Parts used off-road or for racing purposes (unless explicitly stated)

Packaging:                                

1.Polybag
2.Neutral box packing
3.Topshine color box packing
4.Customized box packing

Picture Example:

Delivery Time:

1. 5-7days with stock 

2. 25-35days mass production

Shipping

Picture Example (2)

Picture Example (2)

Picture Example (2)

FAQ:

Q1. Are you a Manufacture or Trading Company?
A1:We are manufacturer and we also have licence to export auto parts.

Q2. What is your MOQ?
A2: We do not have MOQ . we accept lower quantity for your trial order . for the item we have in stock We can even supply you at 5pcs

Q3. How long is the production lead time?
A3:For some itesm we keep some stock that can be delived in 2 weeks New poductioin leadtime 30 days-60days.

Q4. What is your payment term?
A4:Discussed!We accept payment by T/T, L/C, Western Union.

Q5. What is your terms of packing?
A5:Generally,we pack in neutral polybag or boxes and then brown cartons.Also we can Do custom packaging as per your request.


  • Previous:
  • Next:

  • Write your message here and send it to us